CMU store with extensive Geotech complications due to construction within the dipping bedrock district, requiring substantial drilled caissons and a structural floor to mitigate the high risk of large amounts of movement in the soils combined with a high-performance floor finish process to ensure flatness and acceptable finish for the national brand’s standards. Membrane roof with specialized CMU sealing paint on the exterior and storefront glass for the exterior finish.